How long does a kitchen remodel take?

How long a kitchen remodel takes depends on whether anything moves. A cosmetic update, with painted or refaced cabinets, new counters and a backsplash, can be finished in a few weeks of work. A remodel that relocates plumbing, gas or walls usually runs several months from design to final inspection.

What are you remodeling?

Free. No obligation. Up to 3 licensed remodelers.

Most of that time goes to steps that happen away from the house: design decisions, permit review, cabinet manufacturing and the wait between countertop templating and installation. In Redwood City, the Building Division says plan review can take 6 to 24 weeks depending on scope, although residential interior remodels may qualify for its One-Stop review.

Ask each remodeler for a written schedule that separates design, permit, ordering and construction time, so the schedules can be compared on the same basis.

Custom kitchen cabinets in Redwood City →

Kitchen Remodel Redwood City matches you with up to 3 licensed kitchen remodelers who work in Redwood City and nearby, for free written estimates.

More kitchen remodel questions

Talk to a licensed kitchen remodeler about your project in Redwood City

  • Free estimates, no obligation
  • Licensed California remodelers
  • You sign with the remodeler directly
Call (650) 670-3283 Or start online: answer a few quick questions →